← EXPLODED VIEWL01

MATERIAL-LAYER TECHNICAL DOSSIER

Water Interface

The true boundary between product and package, where heat, mass and migrating species are exchanged.

PRE-INDUSTRIAL R2FOOD-CONTACT BOUNDARY
Exploded AQUENORA wall view · Water Interface
L01 · REFERENCE CONFIGURATION
8registered technical fields
8engineering disciplines
0basis / calculated / measured
0targets to be demonstrated
8fields requiring evidence

01 · PRINCIPLE & RATIONALE

Intended function
and associated requirement.

PRINCIPLE

The true boundary between product and package, where heat, mass and migrating species are exchanged.

WHY IT IS INCLUDED

Separating this interface prevents coupon performance from being confused with the behaviour of a complete package in real water contact.

DETAILED DESCRIPTION

The interface governs wetting, adsorption, organoleptic properties, overall and specific migration, NIAS and thermal kinetics.

02 · TECHNOLOGY STACK

Technologies, roles
and approval gates.

T-01

Material and process qualification

Role
Converts the design basis into a repeatable specification.
Why
Performance depends on the real commercial grade and process window.
Approval gate
Documented test evidence and approved specification.

03 · ARCHITECTURE

Function, material
and interfaces.

The inner surface must remain continuous, cleanable, drainable and compatible with filling, closing and shelf life.

MATERIALPackaged water / internal AQUA-PHA surface
CANDIDATE PROCESSWall formation + line conditioning and rinsing
INTERFACES
  • Packaged water
  • Primary wall L02
  • Filling process
  • Closure system
FUNCTIONAL ARCHITECTURE
  1. 01Continuous surface
  2. 02Controlled surface-to-volume ratio
  3. 03No undrainable pockets
  4. 04Protocol covering simulants and real water

04 · MASTER PARAMETER REGISTER

Everything to be defined,
measured or certified.

A field without evidence is never filled with an invented number: it remains “To be determined”, together with the method required to close it. This is what makes the technical record verifiable.

DESIGN BASISTARGETCALCULATED / MEASUREDTO BE VALIDATEDCERTIFICATION REQUIRED
01Identification & function1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X001Intended useUSETo be determined—To be definedFull use cycleDesign review + user studyTO BE VALIDATED
02Geometry & metrology1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X002Nominal massmTo be determinedgTo be defined23 °C / 50% RHBalance 0.001 gTO BE VALIDATED
03Material1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X003Commercial grade and supplierGRADETo be determined—Qualified gradeProduction lotCoA + traceabilityTO BE VALIDATED
04Thermal properties1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X004Service-temperature rangeTserviceTo be determined°CTo be definedUse and transportClimate chamberTO BE VALIDATED
05Mechanical properties1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X005Drop resistanceHdropTo be determinedmTo be definedDefined orientationsInstrumented drop testTO BE VALIDATED
06Quality control1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X006Process capabilityCpkTo be determined—Target to be definedCritical CTQSPC ≥30 samplesTO BE VALIDATED
07Food contact1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X007Overall and specific migrationMIGTo be determinedmg/kgApplicable limitsSimulant/time/temperatureAccredited methodsTO BE VALIDATED
08Recyclability1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L01-X008Territory-specific end-of-life routeEOLTo be determined—Country/area definedComplete assemblyInfrastructure mappingTO BE VALIDATED

05 · INDUSTRIALISATION

From material
to final inspection.

INPUT

Qualified material

Packaged water / internal AQUA-PHA surface

FORMING

Process within window

Wall formation + line conditioning and rinsing

INTEGRATION

Controlled interfaces

Packaged water · Primary wall L02 · Filling process · Closure system

RELEASE

CTQ + traceability

Control starts with resin, drying and processing, then continues through rinsing, filling, particulate inspection and lot traceability.

06 · DVP&R

A function is approved
only after passing its test.

TestRequirementRiskMethodConditionSamplesAcceptanceOutput
DVP-05Condensation managementWet gripClimate + gravimetry25 °C/60% RH; water 4 °C30≥60% less retained waterMass + images
DVP-06ThermoSnowIncorrect thresholdThermal/colour cycles0–25 °C308±2 °C; ≤15 sΔE/T curves
DVP-12Food contactMigration/NIASOverall/specific migrationCold-fill water use3 lotsApplicable regulatory complianceSigned report

07 · FAILURE MODES

Failure modes,
causes and controls.

R-01

Body brittleness

EffectBreakage/leak

CausePHA thermal window

ControlDSC/TGA, rheology, process DOE

RPN 315DVP-02/04
R-02

Non-uniform walls

EffectBuckling/drop failure

CauseAsymmetric geometry

ControlBlow-moulding CAE + micro-CT

RPN 336DVP-02/03
R-03

AeroSkin detachment

EffectLoss of function/loose part

CauseInsufficient seal

ControlPeel, thermal cycling and drop

RPN 280DVP-04/05

08 · EVIDENCE POLICY

Traceability
for every parameter.

Adds no mass, but determines which additives and processes are acceptable in the complete system.

This page is the technical register for the R2 configuration. It separates design values, targets, calculations, measurements and certifications. Open fields identify the exact test or document required to close them.

← P07SoftFold CompactionMAPExploded viewL02 →Primary AQUA-PHA Wall