SoftFold Compaction

End of use is designed as an action: the bottle collapses at defined points without breaking into separate pieces.

PRE-INDUSTRIAL R2END-OF-USE COMPACTION
AQUENORA before and after controlled SoftFold compaction
P07 · REFERENCE CONFIGURATION
21registered technical fields
11engineering disciplines
6basis / calculated / measured
5targets to be demonstrated
10fields requiring evidence

01 · PRINCIPLE & RATIONALE

Intended function
and associated requirement.

PRINCIPLE

End of use is designed as an action: the bottle collapses at defined points without breaking into separate pieces.

WHY IT IS INCLUDED

Once empty, the user compresses three panels and closes the cap; the target residual volume falls to approximately 175 mL.

DETAILED DESCRIPTION

Three flexible panels collapse between rigid load paths; the closed cap creates a vacuum lock. Three locally thinned zones collapse between rigid load paths. Closing the cap creates a vacuum lock that limits elastic rebound. −65% and ≤10% rebound are test targets. Any logistics benefit must be measured across real cases, collection systems and transport routes.

02 · TECHNOLOGY STACK

Technologies, roles
and approval gates.

T-01

Three collapsible panels

Role
Guide repeatable collapse between rigid spines.
Why
Reduce volume without breaking or separating parts.
Approval gate
Compression curve and 20 cycles.
T-02

Designed wall hinges

Role
Concentrate deformation along intended lines.
Why
Prevent random folds from damaging load paths.
Approval gate
Micro-CT, strain mapping and drop.
T-03

Cap-enabled vacuum lock

Role
Retains the compact form after closing.
Why
Limits rebound without straps or accessories.
Approval gate
Residual volume and 30-minute retention.

03 · ARCHITECTURE

Function, material
and interfaces.

Three locally thinned zones collapse between rigid load paths. Closing the cap creates a vacuum lock that limits elastic rebound.

MATERIALLocally thinned zones integrated into the PHA body
CANDIDATE PROCESSControlled wall-thickness map in blow moulding
INTERFACES
  • Shoulder
  • longitudinal ribs
  • cap seal
FUNCTIONAL ARCHITECTURE
  1. 01Panels between rigid spines
  2. 02Empty / compress / close sequence
  3. 03Cap-enabled vacuum lock
  4. 04Zero separate parts

04 · MASTER PARAMETER REGISTER

Everything to be defined,
measured or certified.

A field without evidence is never filled with an invented number: it remains “To be determined”, together with the method required to close it. This is what makes the technical record verifiable.

DESIGN BASISTARGETCALCULATED / MEASUREDTO BE VALIDATEDCERTIFICATION REQUIRED
01Identification & function4 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-001Assembly codeIDP07—To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testDESIGN BASIS
P07-002DesignationNAMESoftFold—To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testDESIGN BASIS
P07-007Use sequenceSEQempty/compress/close—To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testDESIGN BASIS
P07-X001Intended useUSETo be determined—To be definedFull use cycleDesign review + user studyTO BE VALIDATED
02Risk & maturity2 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-003Architecture revisionREVR2—To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testDESIGN BASIS
P07-004Technology readinessTRL2–3levelTo be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testTO BE VALIDATED
03Food contact2 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-005Declaration of ComplianceDoCrequireddocumentTo be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testCERTIFICATION REQUIRED
P07-X007Overall and specific migrationMIGTo be determinedmg/kgApplicable limitsSimulant/time/temperatureAccredited methodsTO BE VALIDATED
04Quality control2 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-006Lot traceabilityLOT100%To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testTARGET
P07-X006Process capabilityCpkTo be determined—Target to be definedCritical CTQSPC ≥30 samplesTO BE VALIDATED
05Geometry & metrology2 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-008Collapsible panelsnpanel3no.To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testDESIGN BASIS
P07-X002Nominal massmTo be determinedgTo be defined23 °C / 50% RHBalance 0.001 gTO BE VALIDATED
06Mechanical properties3 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-009Volume reductionΔV≈65%To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testTARGET
P07-010Elastic rebound after 30 minREB≤10%To be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testTARGET
P07-X005Drop resistanceHdropTo be determinedmTo be definedDefined orientationsInstrumented drop testTO BE VALIDATED
07Durability & reliability1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-011Compaction cyclesNfold20cyclesTo be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testTARGET
08Kinematics / sealing / barrier1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-012Vacuum-lock retentionLOCK30minTo be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testTARGET
09Recyclability2 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-013Separate parts at end of usenloose0partsTo be defined23 °C / 50% RH unless notedCAD, CAE or dedicated testDESIGN BASIS
P07-X008Territory-specific end-of-life routeEOLTo be determined—Country/area definedComplete assemblyInfrastructure mappingTO BE VALIDATED
10Material1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-X003Commercial grade and supplierGRADETo be determined—Qualified gradeProduction lotCoA + traceabilityTO BE VALIDATED
11Thermal properties1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
P07-X004Service-temperature rangeTserviceTo be determined°CTo be definedUse and transportClimate chamberTO BE VALIDATED

05 · INDUSTRIALISATION

From material
to final inspection.

INPUT

Qualified material

Locally thinned zones integrated into the PHA body

FORMING

Process within window

Controlled wall-thickness map in blow moulding

INTEGRATION

Controlled interfaces

Shoulder · longitudinal ribs · cap seal

RELEASE

CTQ + traceability

The function depends on the blow-moulded wall-thickness map: too stiff and it will not activate; too thin and top-load or drop resistance will be compromised.

06 · DVP&R

A function is approved
only after passing its test.

TestRequirementRiskMethodConditionSamplesAcceptanceOutput
DVP-02Wall-thickness mapWeak zonesMicro-CT3 lots15Conforms to frozen CAEThickness map
DVP-03Top/side loadCollapseCompression23 °C; empty/full30+30≥250 N / ≥80 NForce-displacement curves
DVP-04Filled-bottle dropBreakage/leakDrop1 m; water 4 °C; base/side/cap600 leaks; 0 loose partsFailure map
DVP-11SoftFoldReboundCyclic compression20 cycles30−65% V; rebound ≤10%Volume/time

07 · FAILURE MODES

Failure modes,
causes and controls.

R-01

Body brittleness

EffectBreakage/leak

CausePHA thermal window

ControlDSC/TGA, rheology, process DOE

RPN 315DVP-02/04
R-02

Non-uniform walls

EffectBuckling/drop failure

CauseAsymmetric geometry

ControlBlow-moulding CAE + micro-CT

RPN 336DVP-02/03
R-03

AeroSkin detachment

EffectLoss of function/loose part

CauseInsufficient seal

ControlPeel, thermal cycling and drop

RPN 280DVP-04/05

08 · EVIDENCE POLICY

Traceability
for every parameter.

Volume reduction may improve collection and transport, but it does not make the material automatically recyclable or compostable. The appropriate destination remains location-specific.

This page is the technical register for the R2 configuration. It separates design values, targets, calculations, measurements and certifications. Open fields identify the exact test or document required to close them.