tracked parameters
TECHNICAL DATA · R2 REVISION
Parameters, sources and maturity status.
Each item is classified as a design basis, calculation, supplier datasheet, simulation, target or measurement. The register separates defined parameters from those that still require validation.
EVIDENCE ARCHITECTURE
Every parameter declares
its evidence status.
product systems
DVP&R protocols
MEASURED values
MASTER PARAMETER REGISTER
R2 parameter register.
98 visible records · page 1 of 5
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-001 | Assembly code | ID | P01 | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-002 | Designation | NAME | ICE PEBBLE Body | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-003 | Architecture revision | REV | R2 | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-004 | Technology readiness | TRL | 2–3 | level | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
| P01-005 | Declaration of Compliance | DoC | required | document | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | CERTIFICATION REQUIRED |
| P01-006 | Lot traceability | LOT | 100 | % | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-007 | Nominal capacity | Vnom | 500 | mL | — | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-008 | Overall height | H | 208 | mm | Pre-CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-009 | Maximum width | W | 76 | mm | Pre-CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-010 | Maximum depth | D | 60 | mm | Pre-CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-011 | Nominal wall thickness | twall | 0.50 | mm | From wall map | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-012 | Total system mass | mtot | 34–40 | g | From CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-013 | Initial top-load | Ftop | 250 | N | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-014 | Initial side-load | Fside | 80 | N | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-015 | Filled-bottle drop | Hdrop | 1.0 | m | 0 leaks / 0 loose parts | Water at 4 °C | Drop test | TARGET |
| P01-016 | Mass loss / shelf life | WVTR | to be measured | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
| P01-017 | Body-forming technology | PROC | ISBM/EBM to be selected | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
| P02-001 | Assembly code | ID | P02 | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P02-002 | Designation | NAME | AeroSkin | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P02-003 | Architecture revision | REV | R2 | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P02-004 | Technology readiness | TRL | 2–3 | level | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
| P02-005 | Declaration of Compliance | DoC | required | document | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | CERTIFICATION REQUIRED |
| P02-006 | Lot traceability | LOT | 100 | % | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P02-007 | Air-pocket depth | hair | 0.6–0.9 | mm | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
CALCULATION REGISTER
Calculations, inputs
and assumptions.
Dew point
Tdew = b·γ/(a−γ)- Inputs
- 25 °C; RH 0.60
- Result
- ≈16.7 °C
- Assumptions
- Magnus approximation.
- Check
- [°C]
Central resin cost
Cresin = mpack · Presin- Inputs
- 0.038 kg · 6 €/kg
- Result
- €0.228/unit
- Assumptions
- 38 g target mass; scenario price, not a quotation.
- Check
- [kg/unit]·[€/kg]=[€/unit]
Central pack cost
Cpack = Cresin + Cconversion- Inputs
- 0.228 + 0.167
- Result
- ≈€0.395/unit
- Assumptions
- Full scale; excludes water, filling, logistics, margin and VAT.
- Check
- [€/unit]
SoftFold residual volume
Vres = V0·(1−r)- Inputs
- 500·(1−0.65)
- Result
- ≈175 mL
- Assumptions
- Target reduction, to be measured on samples.
- Check
- [mL]
Ice-cube / mouth clearance
ΔD = Dmouth − Dice,max- Inputs
- 42−35
- Result
- 7 mm
- Assumptions
- Nominal functional dimensions.
- Check
- [mm]
Industrialisation budget
CAPEX = Σ tooling + pilot- Inputs
- 120–250k + 100–220k + 35–80k + 60–150k + 80–180k
- Result
- €395–880k
- Assumptions
- Planning envelope; replace with RFQs.
- Check
- [€]
DESIGN VERIFICATION PLAN & REPORT
Twelve tests to turn
targets into evidence.
Every test requires an approved protocol, raw data, sample identification and a signed report.
| ID | Requirement | Part | Risk | Method | Condition | n | Acceptance | Output |
|---|---|---|---|---|---|---|---|---|
| DVP-01 | Volume and envelope | P01 | Out of specification | 3D scan + gravimetry | 23 °C | 30 | 500 mL nominal; R2 envelope | Raw data + report |
| DVP-02 | Wall-thickness map | P01/P06/P07 | Weak zones | Micro-CT | 3 lots | 15 | Conforms to frozen CAE | Thickness map |
| DVP-03 | Top/side load | P01/P06 | Collapse | Compression | 23 °C; empty/full | 30+30 | ≥250 N / ≥80 N | Force-displacement curves |
| DVP-04 | Filled-bottle drop | All | Breakage/leak | Drop | 1 m; water 4 °C; base/side/cap | 60 | 0 leaks; 0 loose parts | Failure map |
| DVP-05 | Condensation management | P02 | Wet grip | Climate + gravimetry | 25 °C/60% RH; water 4 °C | 30 | ≥60% less retained water | Mass + images |
| DVP-06 | ThermoSnow | P03 | Incorrect threshold | Thermal/colour cycles | 0–25 °C | 30 | 8±2 °C; ≤15 s | ΔE/T curves |
| DVP-07 | Closure sealing | P04 | Leak | Inverted leak | 4 °C and 23 °C; 24 h | 30 | 0 leaks | Leak report |
| DVP-08 | Opening and hinge | P04 | Force/fatigue | Force-displacement + cycling | Dry/wet | 30 | 10–18 N; ≥20 cycles | Curves + failures |
| DVP-09 | FlowCrown | P05 | Detachment/blockage | Flow + retention | Ice/fruit/powders | 30 | Full function; 0 detachments | Flow rate + video |
| DVP-10 | Base rocking | P06 | Instability | Standing-plane | Full/empty | 30 | Limit to be frozen | Rocking map |
| DVP-11 | SoftFold | P07 | Rebound | Cyclic compression | 20 cycles | 30 | −65% V; rebound ≤10% | Volume/time |
| DVP-12 | Food contact | All | Migration/NIAS | Overall/specific migration | Cold-fill water use | 3 lots | Applicable regulatory compliance | Signed report |
DESIGN FMEA · PRELIMINARY
Risks, causes
and controls.
No viable end-of-life route
Invalid claim
- Cause
- PHA stream unavailable
- Action
- LCA + territory-specific sortability
- Test
- DVP-12
Non-uniform walls
Buckling/drop failure
- Cause
- Asymmetric geometry
- Action
- Blow-moulding CAE + micro-CT
- Test
- DVP-02/03
Body brittleness
Breakage/leak
- Cause
- PHA thermal window
- Action
- DSC/TGA, rheology, process DOE
- Test
- DVP-02/04
Closure leaks
Product loss
- Cause
- Dual seal outside stack
- Action
- Stack-up + 24 h leak
- Test
- DVP-07
AeroSkin detachment
Loss of function/loose part
- Cause
- Insufficient seal
- Action
- Peel, thermal cycling and drop
- Test
- DVP-04/05
Hinge breaks
Loose part
- Cause
- PHA not sufficiently ductile
- Action
- Grade screening + cycling
- Test
- DVP-08
ThermoSnow migration
Food-contact non-compliance
- Cause
- Defective encapsulation
- Action
- Barrier test + migration/NIAS
- Test
- DVP-06/12
FlowCrown detaches
Use/blockage risk
- Cause
- Insufficient snap
- Action
- Post-drop retention
- Test
- DVP-09
Incorrect colour threshold
Misleading indication
- Cause
- Calibration/thickness
- Action
- Calibration on real wall
- Test
- DVP-06
Grip remains wet
Comfort target missed
- Cause
- Ineffective texture/coating
- Action
- Surface and abrasion DOE
- Test
- DVP-05
Base rocks
Line/shelf issues
- Cause
- Non-planar ring
- Action
- Standing-plane + DOE
- Test
- DVP-10
SoftFold rebounds
Volume not reduced
- Cause
- Elastic memory/leak
- Action
- Panel DOE + vacuum lock
- Test
- DVP-11
CURRENT DECISION
START
the prototype phase.
The configuration is sufficiently defined to begin parametric CAD and material screening. It is not yet authorised for industrial tooling, environmental claims or commercialisation.
- Freeze Class-A surfaces and envelope
- Select 2–3 candidate PHA grades
- Produce coupons and functional mock-ups
- Close DVP-01…12 protocols
- Open RFQs only after G1
PRIMARY SOURCES