COMPONENT TECHNICAL DOSSIER
ICE PEBBLE Body
The body is not a neutral shell: it distributes load, contact and water visibility across distinct yet continuous surfaces.

01 · PRINCIPLE & RATIONALE
Intended function
and associated requirement.
The body is not a neutral shell: it distributes load, contact and water visibility across distinct yet continuous surfaces.
The pebble-shaped section sits naturally in the hand, resists rolling and preserves a long window for checking fill level and cleanliness.
Contains 500 mL, carries loads, guides the grip and integrates the water window, SoftFold and base. Three longitudinal spines carry loads around the grip recesses. The anti-roll section, continuous base and wall-thickness map must be developed as one system. 208 × 76 × 60 mm and 34–40 g define a pre-CAD envelope, not mould-ready dimensions or measured values.
02 · TECHNOLOGY STACK
Technologies, roles
and approval gates.
ICE PEBBLE anti-roll section
- Role
- Distributes grip and load across one continuous asymmetric section.
- Why
- Creates a distinctive bottle architecture while resisting rolling without appendages.
- Approval gate
- Dimensioned CAD, CAE and 3D scan.
Controlled wall-thickness map
- Role
- Separates structural spines, the water window and collapsible zones.
- Why
- Places material where it performs and enables SoftFold.
- Approval gate
- Micro-CT correlated with the blow-moulding model.
ISBM / EBM screening
- Role
- Selects the forming route compatible with the PHA blend.
- Why
- Geometry cannot be frozen before real rheology is known.
- Approval gate
- Process DOE on a commercial grade.
03 · ARCHITECTURE
Function, material
and interfaces.
Three longitudinal spines carry loads around the grip recesses. The anti-roll section, continuous base and wall-thickness map must be developed as one system.
- 42 mm neck
- AeroSkin
- ThermoSnow
- base
- 01Three continuous structural spines
- 02Water window without a separate rigid insert
- 03Pebble-shaped anti-roll section
- 04Integrated interfaces for skin, indicator and base
04 · MASTER PARAMETER REGISTER
Everything to be defined,
measured or certified.
A field without evidence is never filled with an invented number: it remains “To be determined”, together with the method required to close it. This is what makes the technical record verifiable.
01Identification & function3 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-001 | Assembly code | ID | P01 | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-002 | Designation | NAME | ICE PEBBLE Body | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-X001 | Intended use | USE | To be determined | — | To be defined | Full use cycle | Design review + user study | TO BE VALIDATED |
02Risk & maturity2 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-003 | Architecture revision | REV | R2 | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-004 | Technology readiness | TRL | 2–3 | level | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
03Food contact2 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-005 | Declaration of Compliance | DoC | required | document | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | CERTIFICATION REQUIRED |
| P01-X007 | Overall and specific migration | MIG | To be determined | mg/kg | Applicable limits | Simulant/time/temperature | Accredited methods | TO BE VALIDATED |
04Quality control2 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-006 | Lot traceability | LOT | 100 | % | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-X006 | Process capability | Cpk | To be determined | — | Target to be defined | Critical CTQ | SPC ≥30 samples | TO BE VALIDATED |
05Geometry & metrology7 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-007 | Nominal capacity | Vnom | 500 | mL | — | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | DESIGN BASIS |
| P01-008 | Overall height | H | 208 | mm | Pre-CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-009 | Maximum width | W | 76 | mm | Pre-CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-010 | Maximum depth | D | 60 | mm | Pre-CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-011 | Nominal wall thickness | twall | 0.50 | mm | From wall map | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-012 | Total system mass | mtot | 34–40 | g | From CAD | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-X002 | Nominal mass | m | To be determined | g | To be defined | 23 °C / 50% RH | Balance 0.001 g | TO BE VALIDATED |
06Mechanical properties4 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-013 | Initial top-load | Ftop | 250 | N | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-014 | Initial side-load | Fside | 80 | N | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TARGET |
| P01-015 | Filled-bottle drop | Hdrop | 1.0 | m | 0 leaks / 0 loose parts | Water at 4 °C | Drop test | TARGET |
| P01-X005 | Drop resistance | Hdrop | To be determined | m | To be defined | Defined orientations | Instrumented drop test | TO BE VALIDATED |
07Kinematics / sealing / barrier1 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-016 | Mass loss / shelf life | WVTR | to be measured | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
08Manufacturing process1 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-017 | Body-forming technology | PROC | ISBM/EBM to be selected | — | To be defined | 23 °C / 50% RH unless noted | CAD, CAE or dedicated test | TO BE VALIDATED |
09Material1 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-X003 | Commercial grade and supplier | GRADE | To be determined | — | Qualified grade | Production lot | CoA + traceability | TO BE VALIDATED |
10Thermal properties1 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-X004 | Service-temperature range | Tservice | To be determined | °C | To be defined | Use and transport | Climate chamber | TO BE VALIDATED |
11Recyclability1 PARAMETERS
| ID | Parameter | Symbol | Value | Unit | Tolerance | Condition | Method | Status |
|---|---|---|---|---|---|---|---|---|
| P01-X008 | Territory-specific end-of-life route | EOL | To be determined | — | Country/area defined | Complete assembly | Infrastructure mapping | TO BE VALIDATED |
05 · INDUSTRIALISATION
From material
to final inspection.
Qualified material
AQUA-PHA · PHBH/PHB grade to be developed
Process within window
Preform and blow-moulding route to be selected after rheology
Controlled interfaces
42 mm neck · AeroSkin · ThermoSnow · base
CTQ + traceability
Preform and blow-moulding routes remain to be selected after rheology and distribution trials. The asymmetric geometry requires process CAE and micro-CT on early lots.
06 · DVP&R
A function is approved
only after passing its test.
| Test | Requirement | Risk | Method | Condition | Samples | Acceptance | Output |
|---|---|---|---|---|---|---|---|
| DVP-01 | Volume and envelope | Out of specification | 3D scan + gravimetry | 23 °C | 30 | 500 mL nominal; R2 envelope | Raw data + report |
| DVP-02 | Wall-thickness map | Weak zones | Micro-CT | 3 lots | 15 | Conforms to frozen CAE | Thickness map |
| DVP-03 | Top/side load | Collapse | Compression | 23 °C; empty/full | 30+30 | ≥250 N / ≥80 N | Force-displacement curves |
| DVP-04 | Filled-bottle drop | Breakage/leak | Drop | 1 m; water 4 °C; base/side/cap | 60 | 0 leaks; 0 loose parts | Failure map |
| DVP-12 | Food contact | Migration/NIAS | Overall/specific migration | Cold-fill water use | 3 lots | Applicable regulatory compliance | Signed report |
07 · FAILURE MODES
Failure modes,
causes and controls.
Body brittleness
EffectBreakage/leak
CausePHA thermal window
ControlDSC/TGA, rheology, process DOE
Non-uniform walls
EffectBuckling/drop failure
CauseAsymmetric geometry
ControlBlow-moulding CAE + micro-CT
AeroSkin detachment
EffectLoss of function/loose part
CauseInsufficient seal
ControlPeel, thermal cycling and drop
08 · EVIDENCE POLICY
Traceability
for every parameter.
Mass is reduced only after drop, top-load, barrier and shelf-life requirements are met. AQUA-PHA remains a research platform whose bio-based origin and end-of-life route require grade-specific evidence.
This page is the technical register for the R2 configuration. It separates design values, targets, calculations, measurements and certifications. Open fields identify the exact test or document required to close them.