← EXPLODED VIEWL07

MATERIAL-LAYER TECHNICAL DOSSIER

Protective PHBH Film

A transparent barrier separates the active layer from abrasion, water and direct contact.

PRE-INDUSTRIAL R2ACTIVE-LAYER CONTAINMENT
Exploded AQUENORA wall view · Protective PHBH Film
L07 · REFERENCE CONFIGURATION
8registered technical fields
8engineering disciplines
0basis / calculated / measured
0targets to be demonstrated
8fields requiring evidence

01 · PRINCIPLE & RATIONALE

Intended function
and associated requirement.

PRINCIPLE

A transparent barrier separates the active layer from abrasion, water and direct contact.

WHY IT IS INCLUDED

Enables the thermochromic signal to remain contained throughout the use cycle.

DETAILED DESCRIPTION

Thickness, haze, permeability, adhesion, toughness and thermal stability must protect without excessively delaying the signal.

02 · TECHNOLOGY STACK

Technologies, roles
and approval gates.

T-01

Material and process qualification

Role
Converts the design basis into a repeatable specification.
Why
Performance depends on the real commercial grade and process window.
Approval gate
Documented test evidence and approved specification.

03 · ARCHITECTURE

Function, material
and interfaces.

The film must remain inseparable in use and create no raised edges or accumulation points.

MATERIALTransparent PHBH cover film
CANDIDATE PROCESSFilm forming + perimeter sealing
INTERFACES
  • Layer L06
  • External environment
  • Seal to L02
  • Vision system
FUNCTIONAL ARCHITECTURE
  1. 01Transparent film
  2. 02Sealed perimeter
  3. 03No free edge
  4. 04Continuous barrier

04 · MASTER PARAMETER REGISTER

Everything to be defined,
measured or certified.

A field without evidence is never filled with an invented number: it remains “To be determined”, together with the method required to close it. This is what makes the technical record verifiable.

DESIGN BASISTARGETCALCULATED / MEASUREDTO BE VALIDATEDCERTIFICATION REQUIRED
01Identification & function1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X001Intended useUSETo be determined—To be definedFull use cycleDesign review + user studyTO BE VALIDATED
02Geometry & metrology1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X002Nominal massmTo be determinedgTo be defined23 °C / 50% RHBalance 0.001 gTO BE VALIDATED
03Material1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X003Commercial grade and supplierGRADETo be determined—Qualified gradeProduction lotCoA + traceabilityTO BE VALIDATED
04Thermal properties1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X004Service-temperature rangeTserviceTo be determined°CTo be definedUse and transportClimate chamberTO BE VALIDATED
05Mechanical properties1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X005Drop resistanceHdropTo be determinedmTo be definedDefined orientationsInstrumented drop testTO BE VALIDATED
06Quality control1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X006Process capabilityCpkTo be determined—Target to be definedCritical CTQSPC ≥30 samplesTO BE VALIDATED
07Food contact1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X007Overall and specific migrationMIGTo be determinedmg/kgApplicable limitsSimulant/time/temperatureAccredited methodsTO BE VALIDATED
08Recyclability1 PARAMETERS
IDParameterSymbolValueUnitToleranceConditionMethodStatus
L07-X008Territory-specific end-of-life routeEOLTo be determined—Country/area definedComplete assemblyInfrastructure mappingTO BE VALIDATED

05 · INDUSTRIALISATION

From material
to final inspection.

INPUT

Qualified material

Transparent PHBH cover film

FORMING

Process within window

Film forming + perimeter sealing

INTEGRATION

Controlled interfaces

Layer L06 · External environment · Seal to L02 · Vision system

RELEASE

CTQ + traceability

Cutting, placement, sealing and vision inspection must create a continuous barrier around the patch.

06 · DVP&R

A function is approved
only after passing its test.

TestRequirementRiskMethodConditionSamplesAcceptanceOutput
DVP-05Condensation managementWet gripClimate + gravimetry25 °C/60% RH; water 4 °C30≥60% less retained waterMass + images
DVP-06ThermoSnowIncorrect thresholdThermal/colour cycles0–25 °C308±2 °C; ≤15 sΔE/T curves
DVP-12Food contactMigration/NIASOverall/specific migrationCold-fill water use3 lotsApplicable regulatory complianceSigned report

07 · FAILURE MODES

Failure modes,
causes and controls.

R-01

Body brittleness

EffectBreakage/leak

CausePHA thermal window

ControlDSC/TGA, rheology, process DOE

RPN 315DVP-02/04
R-02

Non-uniform walls

EffectBuckling/drop failure

CauseAsymmetric geometry

ControlBlow-moulding CAE + micro-CT

RPN 336DVP-02/03
R-03

AeroSkin detachment

EffectLoss of function/loose part

CauseInsufficient seal

ControlPeel, thermal cycling and drop

RPN 280DVP-04/05

08 · EVIDENCE POLICY

Traceability
for every parameter.

Avoids metal supports and electronics; compatibility with the PHA route remains to be demonstrated on the full stack.

This page is the technical register for the R2 configuration. It separates design values, targets, calculations, measurements and certifications. Open fields identify the exact test or document required to close them.

← L06ThermoSnow Active LayerMAPExploded viewP01 →ICE PEBBLE Body